- Greens were vertical mowed and sand topdressed and are recovering nicely following spring aeration.
- Tees and fairways were also vertical mowed.
- Sod work was completed in several areas where plant materials were removed last fall including holes 10, 15, 17.
- The large mulch bed along the cart path on number one was removed and will be regrassed next week to alleviate mulch washing away during every rain event.
- Drainage work on 7 and nine tee was nearly completed.
- Overgrowth of invasive plant materials was removed surrounding 8 pond and will be treated to improve the aesthetics of the small wet land pond.
- Numerous other small projects were also completed including irrigation head leveling repair and leveling areas where stumps were removed last fall.
Bunkers will get a lot of attention this next week:
- Sand will be added.
- Drainage will be repaired where needed.
- Damaged grass faces will be repaired.
- Edging will be completed.
See you all on the course!